Establish root test fixtures for repeated process and environment setup #8289
I'd like to take sequential PR 1, the onboarding child-process harness. Following up from #8290, which established the fixture conventions this epic's maintainer audit endorsed.
Plan for the pilot:
Add a support module owning the child-process setup mechanics the onboarding suites currently hand-roll: temporary home creation and cleanup, fake-bin directory with a stub writer, environment composition (HOME, PATH prepend, deterministic vars), a spawn runner returning status and output, and registry/session readers.
Pilot on four suites with the same inline shape: onboard-remote-recreate-credential-reuse, onboard-reservation-recreate, onboard-prepared-gateway-handoff, and onboard-gateway-port-conflict-fast-fail.
Stub script contents, scenario env values, and assertions stay in each test per the acceptance criteria; helpers return fresh state and restore the environment.
Will open the PR once the affected suites pass in normal and shuffled order with a negative net LOC delta.
Sequential PR 1 is up as #8537. Continuing with sequential PR 2, the in-memory onboarding-machine runtime fixture; I will open it once PR 1 lands so any review conventions from PR 1 carry over.
The changes add no generic mock DSL or automatic behavior default.
Each PR records targeted test, type-check, repository-check, and documentation writer review evidence.
PR #8559 records the remaining scope decision. It did not create a shared corporate-CA asset because the PEM blocks are scenario-specific. Sharing one block would change the tested certificate content.
Activity
JulienAu commentedon Aug 7, 2026
I'd like to take sequential PR 1, the onboarding child-process harness. Following up from #8290, which established the fixture conventions this epic's maintainer audit endorsed.
Plan for the pilot:
onboard-remote-recreate-credential-reuse,onboard-reservation-recreate,onboard-prepared-gateway-handoff, andonboard-gateway-port-conflict-fast-fail.Will open the PR once the affected suites pass in normal and shuffled order with a negative net LOC delta.
JulienAu commentedon Aug 7, 2026
Sequential PR 1 is up as #8537. Continuing with sequential PR 2, the in-memory onboarding-machine runtime fixture; I will open it once PR 1 lands so any review conventions from PR 1 carry over.
test(onboard): add an in-memory machine runtime fixture
test(onboard): add a child-process harness for four pilot suites (#8537)
test(install): add installer run and npm-stub fixtures
test(onboard): add an in-memory machine runtime fixture (#8546)
test(openclaw): add a config-generation environment fixture
test(install): keep caller-provided homes caller-owned on remove
test(install): add installer run and npm-stub fixtures (#8556)
test(openclaw): add a config-generation environment fixture (#8559)
test(integration): consolidate isolated host process scenarios (#8881)
jyaunches commentedon Aug 20, 2026
Completion review
All four planned migrations merged:
PR #8881 later consolidated the remaining host-process scenarios and removed 697 net lines.
The acceptance review found:
PR #8559 records the remaining scope decision. It did not create a shared corporate-CA asset because the PEM blocks are scenario-specific. Sharing one block would change the tested certificate content.
Closing as completed.