Skip to content

test(e2e): remove remaining native-Podman false reds after #9923 #10865

Closed as not planned

Description

@ericksoa

Investigation Summary

  • PR feat(runtime): activate qualified native Podman #9923 merged supported native Podman activation; the final full-matrix reruns left no confirmed Podman product regression.
  • The only failure unique to Podman in attempt 3 was the OpenClaw channels stop/start lane. Its Docker twin passed.
  • That Podman lane failed identically in attempts 2 and 3 because the E2E directly asserted a private stopped-state cleanup helper returned { cleared: true }; it instead returned cleanup-helper-failed.
  • A second Podman-only false red appeared in attempt 2 when the cold-onboard progress assertion measured a 63-second silent gap against a 60-second guarantee. The same lane passed attempt 3 without a code change.
  • Other red Podman-labeled jobs in attempt 3 also had red Docker twins and are outside this issue.

Description

Clean up the remaining native-Podman E2E false reds observed while qualifying PR #9923.

This issue is test/harness work. The available evidence does not show that native Podman activation, channel stop/start behavior, inference, or cleanup failed as a user-visible product contract. The persistent failure comes from test/e2e/live/channels-stop-start-helpers.ts directly invoking clearStoppedSandboxStateRoots and asserting an internal result. The test reaches this assertion after the preceding channel lifecycle phases pass.

The intermittent cold-onboard failure is also a harness/progress-reporting problem: attempt 2 observed a 63-second output gap, while attempt 3 passed the same 60-second requirement without a product change.

Reproduction Steps

  1. Inspect full Docker + Podman E2E run 33594413526, candidate ebb851b756df8b74e9372f680616c634bf59316f.
  2. In attempt 2, inspect OpenClaw channels stop/start on Podman.
  3. In attempt 3, inspect the repeated OpenClaw channels stop/start on Podman.
  4. Compare the green attempt-3 Docker twin.
  5. For the progress flake, inspect attempt 2 OpenClaw full E2E on Podman, then compare its attempt-3 success in the same workflow run.

Environment

Debug Output

The repeatable channels failure is:

AssertionError: expected { cleared: false, …(1) } to deeply equal { cleared: true }

Expected:
{ "cleared": true }

Received:
{ "cleared": false, "failure": "cleanup-helper-failed" }

removeChannelsAndRebuild
test/e2e/live/channels-stop-start-helpers.ts:1079

The intermittent progress failure is:

AssertionError: longest silent gap 63s exceeds the 60s guarantee:
expected 63 to be less than or equal to 60

assertColdOnboardPerformance
test/e2e/live/full-e2e.test.ts:358

Expected Behavior

  • The channels stop/start E2E should exercise the supported public channel-removal lifecycle rather than directly requiring a private stopped-state cleanup helper to succeed.
  • The test must continue to prove channel state, provider/policy removal, sandbox stop/start, preserved unrelated state, and final cleanup on both Docker and native Podman.
  • Rootless-Podman onboarding must emit observable progress within the existing 60-second guarantee, including during slow managed-image/build work.
  • A test failure must retain the exact failing operation and sanitized exit/stderr evidence instead of collapsing useful diagnostics into only cleanup-helper-failed.

Acceptance Criteria

  • Reconcile PR #10630 with the native-Podman code now on main; do not apply its pre-feat(runtime): activate qualified native Podman #9923 Docker assumptions blindly.
  • Update channels-stop-start to drive the supported public channel-removal flow. Do not make the E2E call a private cleanup helper solely to manufacture stopped-state coverage.
  • Preserve real behavioral assertions for OpenClaw channel removal, disabled/enabled state, provider and policy lifecycle, stop/start recovery, unrelated-state preservation, and cleanup.
  • If stopped-state cleanup remains a supported provider contract after the fix(messaging): remove unsupported stopped Docker cleanup #10630 reconciliation, cover it at the provider/integration boundary and record the sanitized helper create/start exit status and stderr. Do not keep only an opaque cleanup-helper-failed result.
  • Fix progress emission or measurement so the Podman cold-onboard lane reliably satisfies the existing 60-second heartbeat contract. Do not merely raise the threshold, add a retry, or suppress the assertion.
  • Add deterministic tests for the selected public-flow and heartbeat behavior.
  • Run the exact affected Docker and native-Podman lanes. Both must pass from the same current candidate.
  • Keep shared Docker/Podman inference, MCP, credential-scan, and GPU failures out of this issue.

Scope Boundaries

  • Test and E2E harness cleanup only unless new direct evidence proves a product defect.
  • No change to inference routing, image publication, GPU qualification, unrelated Docker failures, or the native-Podman activation contract merged by feat(runtime): activate qualified native Podman #9923.
  • No weakening of exact runtime identity, fail-closed cleanup, or credential redaction.

Checklist

  • Reproduced twice for the stopped-state helper assertion.
  • Confirmed the Docker twin passed in attempt 3.
  • Confirmed the heartbeat failure passed on rerun without a code change.
  • Searched open and closed issues for an exact duplicate.

Activity

  1. added
    area: e2e
    needs: triage
    platform: container
    on Sep 2, 2026
  2. added
    integration: openclaw
    on Sep 3, 2026
  3. added theissue type on Sep 3, 2026
  4. removed
    needs: triage
    on Sep 3, 2026
  5. added
    area: ci
    on Oct 30, 2026
  6. wscurran commented on Nov 17, 2026

    @wscurran
    Contributor

    Hi Aaron, thanks for the work and discussion here. We’re planning an updated architecture for NemoClaw, so we’re closing this remaining CI and E2E maintenance work as not planned.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area: ciarea: e2eintegration: openclawplatform: container

    Type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions