A 1U vented shelf (~$25–45) in U4, the one free slot, to carry the unmanaged
TP-Link that prometheus and oracle hang off.
Why it is a monitoring issue, not a tidiness one
Both shelf machines are laptops with their own batteries. On a mains cut they
stay running and go deaf — the switch between them and the network has no
battery at all. A monitoring host that survives the event it exists to observe
but cannot report it is a strange way to lose an evidence trail.
That is the same class of fault as the ones found while verifying #12: a
component that is up, reports itself healthy, and produces nothing. This one just
has a physical cause.
Buy it with the UPS pack, not after
Coupled to #93. The APCRBC115 cartridge on its own leaves the monitoring path
half-protected: the hosts ride out the cut and the switch does not. Ordering them
together is the whole point — two purchases, one outcome.
The spec is settled
Measured at the rack on 2026-08-21:
- 4-post frame, square mounting holes. Depth is not a constraint.
- So: a full 1U shelf with rear support, not a cantilever.
- Cage nuts plus screws — most shelves include them, not all. Check the
listing rather than discovering it on the day.
U4 is empty only because nothing had been chosen for it, so there is no service
clearance to preserve.
The purchase cannot be avoided — this was checked
morpheus sits at U5 in a purpose-built mount that holds one ProDesk Mini —
a single-device bracket, not a shelf with spare room. The switch therefore needs
its own U, and the shelf is the way to give it one.
The 1U shelf also has room beside the switch for a second small box later, which
the U5 bracket by design does not.
Rack the cold spare here too, powered off
The spare ProDesk from #92 goes on this shelf beside the switch — racked, cabled
for its cold-spare role, and left powered off. A spare that is plugged in and
on the network is exposed to whatever took the primary.
Was the last item in docs/roadmap.md
still carrying its own checkbox; filed so the roadmap holds no state of its own.
Activity
docs: the installer stick is not in the rack yet, and rewrap #76
Gerrrt commentedon Sep 8, 2026
Reopened. This was closed by accident, not by a rack visit.
How it closed: commit 7147f0e (2026-08-27, docs(runbooks): fit the UPS
battery and rack the shelf switch) wrote the procedure before the boxes were
open. Its message says "the middle step is the one that closes #110" — and
GitHub read closes #110 as a close keyword and closed this issue when the
commit reached
main. The same commit's own last paragraph says "Nothing hereclaims a fitted battery." It did not claim a racked shelf either.
What every document says since, and they agree:
docs/hardware.md— the shelf is on hand … not in the rack table abovebecause it is not yet in the rack.
docs/runbooks/fit-the-ups-battery.md, status banner of 2026-09-03 — theshelf and the switch move (step 2, items 1–4) were not done, so Rack the shelf switch in U4 — buy it with the UPS pack #110 is
untouched and
prometheusandoraclestill go deaf on a mains cut.docs/roadmap.md— under Infrastructure, open: the shelf is on hand; whatis left is the rack visit.
README.md— the switch between the monitoring host and the network stillhas no battery at all.
Confirmed on 2026-09-08: still not racked. The roadmap entry is correct and
stays where it is; the thing that was wrong was this issue's state.
What closes it is unchanged from the runbook's step 2: shelf into U4 with
the rear support engaged, the TP-Link onto it, and — the step that actually
closes the gap — its power onto a UPS-fed outlet. The spare ProDesk from #92
(ordered 2026-09-08) racks beside it, powered off, so the two visits can be
one. Then
hardware.mdgains the U4 row,network.md's TP-Link note changes,and the roadmap entry moves to Done.
🤖 Generated with Claude Code
Merge pull request #402 from Gerrrt/gerrrt/roadmap-110-reopened
Gerrrt commentedon Sep 8, 2026
Reopened a second time. Closed at 15:40 UTC by the merge of #402 — the PR
that documents the first accidental close.
The commit message quoted the original phrase, "is the one that closes
#110", with a line break between closes and #110. GitHub matches close
keywords across whitespace, so the quotation did the same thing the original
sentence did. I checked the message for the phrase before merging and read it
as safe because of the line break; it was not.
Rule for anything that touches this issue from here: do not put the word
closes (or fixes, resolves) in front of
#110in a commit message or PRbody, quoted or not, until the shelf is racked. Say "the step that finishes the
issue" or reference it as
Refs #110. The roadmap paragraph merged in #402carries the quoted phrase inside a file, which GitHub does not read, and stays.
State of the work is unchanged: shelf on hand, not racked, switch on a wall
socket.
🤖 Generated with Claude Code
Gerrrt commentedon Sep 8, 2026
Done, 2026-09-08. The shelf is in U4, the TP-Link is on it with its uplink back
on port 3 of
neo, and its power is on a UPS-fed outlet — the step this issuewas actually about.
Seen from the monitoring host during the move
neoport 3ifOperStatus=1The 28 minutes crossed every
forwindow that matters — the SNMP and gatewaychecks at 10 minutes, oracle's push staleness at 15 — which is what the silence
was for. Two alerts outlived it briefly and cleared on their own: the wiki probe
on
oracle, and Alertmanager's own delivery failures from the disconnect.What the monitoring host cannot verify: that the outlet is UPS-fed. The UPS
reports its output source, not which device draws from it. Attested by the
person at the rack, and recorded in the docs on that basis.
Docs in #406: the U4 row in
hardware.md, the TP-Link note innetwork.md, the UPS runbook's banner, theroadmap entry to Done, and the README sentence. That PR closes this issue on
merge, on purpose — the two earlier closes were a commit message quoting the
phrase, and are recorded in the roadmap entry so the next reader knows which
close was the real one.